Dawn sent an email to Briana from Dominion Power to push for the signature.
Hi Briana, meter base passed inspection on 10/30/2015. Has the UA & design been sent to the Kang’s yet for signature? Thx, Dawn
I also called Briana, but she mentioned that she would take one day off on Thursday(11/5/15) and Friday (11/6/15). But she would finish the design work on Monday (11/9/15).