{"id":492,"date":"2016-01-05T01:47:07","date_gmt":"2016-01-05T01:47:07","guid":{"rendered":"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/?p=492"},"modified":"2016-01-07T01:47:27","modified_gmt":"2016-01-07T01:47:27","slug":"cabinet-walk","status":"publish","type":"post","link":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2016\/01\/05\/cabinet-walk\/","title":{"rendered":"Cabinet walk"},"content":{"rendered":"<p>Cabinet walk is today.\u00a0 Jin and Vince met in the new house.\u00a0 Dawn sent email as following.<\/p>\n<p><strong><u>Drywall &amp; Trim Stage<\/u><\/strong><u> (Approximately 30 Business Days)<\/u>*supply propane for temp heat if necessary*<\/p>\n<ul>\n<li>Drywall hung, taped and finished<\/li>\n<li>Interior Trim, Paint Interior<\/li>\n<li>Flooring<\/li>\n<li>Kitchen Cabinets 37 calendar days to the ProHome Orientation walk (if all utilities completed)<\/li>\n<li>Countertops and Vanities<\/li>\n<li>CABINET WALK<\/li>\n<\/ul>\n<p><u>\u00a0<\/u><\/p>\n<p><strong><u>Final Stage<\/u><\/strong><u> (Approximately 30 Business Days)<\/u><\/p>\n<ul>\n<li>HVAC, Electrical, &amp; Plumbing Fixtures<\/li>\n<li>Appliances Installed<\/li>\n<li>Complete Painting &amp; Touch-up<\/li>\n<li>Carpet<\/li>\n<li>Cleaning<\/li>\n<li>Final Grade (35\u2019 around house)<\/li>\n<\/ul>\n<p>PRO-HOME ORIENTATION WALK 5 business days to your NDI settlement<\/p>\n<p>&nbsp;<\/p>\n<p><strong>NDI Settlement <\/strong>Must have Occupancy permit at least 24 hours prior to settlement<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cabinet walk is today.\u00a0 Jin and Vince met in the new house.\u00a0 Dawn sent email as following. Drywall &amp; Trim Stage (Approximately 30 Business Days)*supply propane for temp heat if necessary* Drywall hung, taped and finished Interior Trim, Paint Interior &hellip; <a href=\"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2016\/01\/05\/cabinet-walk\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-492","post","type-post","status-publish","format-standard","hentry","category-house-building-diary"],"_links":{"self":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/comments?post=492"}],"version-history":[{"count":1,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/492\/revisions"}],"predecessor-version":[{"id":493,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/492\/revisions\/493"}],"wp:attachment":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/media?parent=492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/categories?post=492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/tags?post=492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}