{"id":217,"date":"2015-10-06T21:15:19","date_gmt":"2015-10-06T21:15:19","guid":{"rendered":"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/?p=217"},"modified":"2015-10-11T18:41:42","modified_gmt":"2015-10-11T18:41:42","slug":"start-to-install-the-windows","status":"publish","type":"post","link":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2015\/10\/06\/start-to-install-the-windows\/","title":{"rendered":"Start to install the windows.\u00a0"},"content":{"rendered":"<p>After roof is done, windows are being installed.<\/p>\n<p>Dawn also sent several emails regarding the frame walk and also\u00a0mention that we can view and select the slab for our granite countertops.<\/p>\n<p>email 1:<\/p>\n<p><span id=\"yui_3_16_0_1_1444585380400_4068\">Framing is almost complete and you will be meeting your Project Manager for your <span id=\"yui_3_16_0_1_1444585380400_4070\"><span style=\"font-size: medium;\">Frame Walk on Mon Oct 12<\/span><sup><span style=\"font-size: small;\">th<\/span><\/sup><span style=\"font-size: medium;\"> at 9am<\/span><\/span>. Please remember to bring your 400amp single service meter base with you if you have already done so.\u00a0 The next critical phase is the mechanical stage.<\/span><\/p>\n<h4 id=\"yui_3_16_0_1_1444585380400_4099\"><u id=\"yui_3_16_0_1_1444585380400_4101\"><span id=\"yui_3_16_0_1_1444585380400_4100\">Mechanical Rough In &amp; Exterior Finish (Approx. 30 Business days)<\/span><\/u><\/h4>\n<p class=\"yiv2896448589MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 HVAC, Plumbing, &amp; Electrical Rough In<\/p>\n<p class=\"yiv2896448589MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Insulation\/Energy Seal Package Installed<\/p>\n<p class=\"yiv2896448589MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0Close in inspections<\/p>\n<p class=\"yiv2896448589MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Schedule Pre Drywall Walk<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4093\" class=\"yiv2896448589MsoNormal\"><b id=\"yui_3_16_0_1_1444585380400_4096\"><u id=\"yui_3_16_0_1_1444585380400_4095\"><span id=\"yui_3_16_0_1_1444585380400_4094\"><strong>Mechanical Stage<\/strong><\/span><\/u><\/b><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4092\" class=\"yiv2896448589MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_4091\">The mechanical trades (plumbing, HVAC &amp; electrical) will be conducting their mechanical rough in\u2019s.\u00a0 After the mechanical trades are complete, the house will be insulated and the energy seal package will be complete.\u00a0 As a reminder, the house will soon become locked at all times. Access will be granted during normal business hours only and will need to be coordinated through our office. NDI policy states that keys and lockbox codes are for NDI contractors use only. <\/span><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4087\" class=\"yiv2896448589MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_4085\">Mechanical trades will rough in your home, this includes HVAC, plumbing and electrical contractors. After all trades finish their rough ins, a close in inspection is called before we can start drywall. After your utility companies run the lines from the street to the house you can then call for them to come back to install the meter(s). Siding &amp; brick contractors will be working outside as well. <\/span><\/p>\n<p class=\"yiv2896448589MsoNormal\">The Pre-Drywall Walk occurs after the mechanical trades have completed their rough in\u2019s.\u00a0 The purpose of this walk is to verify that all of the special options you have selected have been installed in their proper location and to answer any questions you may have.<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4076\" class=\"yiv2896448589MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_4077\">Should you have any questions, please feel free to contact me.<\/span><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4075\" class=\"yiv2896448589MsoNormal\">\u00a0<span id=\"yui_3_16_0_1_1444585380400_4159\">Thanks, Dawn<\/span><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_4156\" class=\"yiv2896448589MsoNormal\">\u00a0email 2:<\/p>\n<p><span id=\"yui_3_16_0_1_1444585380400_2319\">You have an opportunity to view &amp; select the slab for your granite countertops. We request this because each lot can look different within certain granite selections. This is not mandatory but we find that most customers like to take advantage of this opportunity.\u00a0 Please contact A&amp;S Sales at <a id=\"yui_3_16_0_1_1444585380400_2327\" rel=\"nofollow\" shape=\"rect\"><\/a><span style=\"font-size: medium;\">301-898-7400<\/span> to schedule an appointment or to let A&amp;S know that you are waiving the selection process. A&amp;S is located at 9834 Liberty Road Frederick, MD 21701 and your current granite selection is: <u id=\"yui_3_16_0_1_1444585380400_2328\"><span style=\"font-size: medium;\">BLACK PEARL.<\/span><\/u><\/span><\/p>\n<p><a href=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/10\/IMG_3264.jpg\"><img decoding=\"async\" src=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/10\/IMG_3264.jpg\" alt=\"\" \/><\/a>\u00a0\u00a0<a href=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/10\/IMG_3273.jpg\"><img decoding=\"async\" src=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/10\/IMG_3273.jpg\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>After roof is done, windows are being installed. Dawn also sent several emails regarding the frame walk and also\u00a0mention that we can view and select the slab for our granite countertops. email 1: Framing is almost complete and you will &hellip; <a href=\"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2015\/10\/06\/start-to-install-the-windows\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-217","post","type-post","status-publish","format-standard","hentry","category-house-building-diary"],"_links":{"self":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/comments?post=217"}],"version-history":[{"count":6,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/217\/revisions"}],"predecessor-version":[{"id":241,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/217\/revisions\/241"}],"wp:attachment":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/media?parent=217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/categories?post=217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/tags?post=217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}