{"id":154,"date":"2015-09-28T18:06:41","date_gmt":"2015-09-28T18:06:41","guid":{"rendered":"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/?p=154"},"modified":"2015-10-11T18:49:54","modified_gmt":"2015-10-11T18:49:54","slug":"working-on-the-roof","status":"publish","type":"post","link":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2015\/09\/28\/working-on-the-roof\/","title":{"rendered":"Working on the roof.\u00a0"},"content":{"rendered":"<p>Monday.\u00a0 Started to working on the roof.\u00a0 It will rain so hopefully the roof can be up ASAP.\u00a0 At the end of the day, most part of the roof is up but the middle still not completely covered.<\/p>\n<p>Dawn sent an email to update the status.<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6008\" class=\"yiv5370945837MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_6009\">Hi Helen, trusses were delivered Friday and being set today. Then plywood, paper and shingles to follow.\u00a0 These materials are made to withstand the elements so nothing to worry about there. Thx, Dawn<\/span><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6006\" class=\"yiv5370945837MsoNormal\"><b id=\"yui_3_16_0_1_1444585380400_6020\"><u id=\"yui_3_16_0_1_1444585380400_6019\"><span id=\"yui_3_16_0_1_1444585380400_6018\"><strong>Foundation Stage<\/strong><\/span><\/u><\/b><u id=\"yui_3_16_0_1_1444585380400_6015\"><span id=\"yui_3_16_0_1_1444585380400_6014\"> (Approximately 30 Business Days)<\/span><\/u> Apply for utilities now (water\/sewer, power &amp; gas)<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_5971\" class=\"yiv5370945837MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <span id=\"yui_3_16_0_1_1444585380400_6021\">Excavation<\/span><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6023\" class=\"yiv5370945837MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <span id=\"yui_3_16_0_1_1444585380400_6022\">Foundation Footing Formed &amp; Poured <\/span><\/p>\n<p class=\"yiv5370945837MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Foundation Walls Formed &amp; Poured <span style=\"font-size: small;\">Sewer determination to be made (hung vs gravity)<\/span><\/p>\n<p class=\"yiv5370945837MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Water-proofing\/Drain Tile\/ Backfill\/Plumbing Ground Works<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6025\" class=\"yiv5370945837MsoNormal\">\u00b7\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <span id=\"yui_3_16_0_1_1444585380400_6024\">Basement &amp; Garage Slabs Poured <span style=\"font-size: small;\">Construction entrance will need to be extended to garage slab<\/span><\/span><\/p>\n<p class=\"yiv5370945837MsoNormal\">FOUNDATION WALK 9\/17\/15<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6029\" class=\"yiv5370945837MsoNormal\">\u00a0<b id=\"yui_3_16_0_1_1444585380400_6057\"><u id=\"yui_3_16_0_1_1444585380400_6056\"><span id=\"yui_3_16_0_1_1444585380400_6055\"><strong>Frame Stage<\/strong><\/span><\/u><\/b><u> (Approximately 30 Business Days)<\/u><u><\/u><\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6026\" class=\"yiv5370945837MsoNormal\"><span style=\"font-family: Symbol;\"><span style=\"font-size: small;\">\u00b7<\/span><span style=\"font-size: small;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span>Floor Joists and Sub-flooring<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6027\" class=\"yiv5370945837MsoNormal\"><span style=\"font-family: Symbol;\"><span style=\"font-size: small;\">\u00b7<\/span><span style=\"font-size: small;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span>Wall Framing and Roof Shingles<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6028\" class=\"yiv5370945837MsoNormal\"><span style=\"font-family: Symbol;\"><span style=\"font-size: small;\">\u00b7<\/span><span style=\"font-size: small;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span>Windows &amp; Exterior Doors<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6034\" class=\"yiv5370945837MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_6050\"><span id=\"yui_3_16_0_1_1444585380400_6049\"><span style=\"font-family: Symbol;\"><span style=\"font-size: small;\">\u00b7<\/span><span id=\"yui_3_16_0_1_1444585380400_6048\"><span style=\"font-size: small;\">\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><\/span><\/span><\/span>Stairs<\/p>\n<p id=\"yui_3_16_0_1_1444585380400_6033\" class=\"yiv5370945837MsoNormal\"><span id=\"yui_3_16_0_1_1444585380400_6047\">FRAME WALK<\/span><span id=\"yui_3_16_0_1_1444585380400_6032\"> <span id=\"yui_3_16_0_1_1444585380400_6031\"><span style=\"font-size: small;\">Bring meter base &amp; place add\u2019l purchased items (MM\/outlets\/lights\/etc.) as well as island<\/span><\/span><\/span><\/p>\n<p><a href=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3198.jpg\"><img decoding=\"async\" src=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3198.jpg\" alt=\"\" \/><\/a>\u00a0\u00a0<a href=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3196.jpg\"><img decoding=\"async\" src=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3196.jpg\" alt=\"\" \/><\/a>\u00a0\u00a0<a href=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3195.jpg\"><img decoding=\"async\" src=\"http:\/\/www.housebuildingdiary.com\/BuildHouseDiary\/wp-content\/uploads\/2015\/09\/IMG_3195.jpg\" alt=\"\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Monday.\u00a0 Started to working on the roof.\u00a0 It will rain so hopefully the roof can be up ASAP.\u00a0 At the end of the day, most part of the roof is up but the middle still not completely covered. Dawn sent &hellip; <a href=\"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/2015\/09\/28\/working-on-the-roof\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-154","post","type-post","status-publish","format-standard","hentry","category-house-building-diary"],"_links":{"self":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/comments?post=154"}],"version-history":[{"count":5,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/154\/revisions"}],"predecessor-version":[{"id":244,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/posts\/154\/revisions\/244"}],"wp:attachment":[{"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/media?parent=154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/categories?post=154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/housebuildingdiary.120perhour.com\/BuildHouseDiary\/wp-json\/wp\/v2\/tags?post=154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}